Energy Fuels releases feasibility study for Madagascar mineral sands project
Energy Fuels Inc. (NYSE American:UUUU, TSX:EFR) announced Monday the publication of a new feasibility study for its Vara Mada (formerly Toliara) Mineral Sands and Rare Earths Project in southwest Madagascar. The technical report, prepared by Base Resources Limited and effective as of June 30, 2025, outlines updated estimates of mineral resources, reserves, production plans, and financial metrics for the project.
According to the report, the Ranobe deposit, located 45 km north of Toliara city, contains a measured and indicated mineral resource of 1.39 billion tonnes at 5.1% total heavy minerals. The proven and probable mineral reserve is 904 million tonnes at 6.1% total heavy minerals, with assemblages including ilmenite, rutile, zircon, and monazite.
The project is planned to be developed in two stages. Stage 1 will process 12.6 million tonnes of ore per year, while Stage 2 will double throughput to 25 million tonnes per year. Over a scheduled 38-year mine life, the operation is expected to produce an annual average of 959,000 tonnes of ilmenite, 66,000 tonnes of zircon, 8,000 tonnes of rutile, and 24,000 tonnes of monazite.
Capital costs are estimated at $769 million for Stage 1 and $142 million for Stage 2. Life-of-mine average operating costs are projected at $4.95 per tonne mined or $112.52 per tonne of product, with average annual operating costs of $118.8 million.
A discounted cash flow analysis in the report indicates a net present value of $1.415 billion (10% discount rate, post-tax, real) and an internal rate of return of 22.1%, measured as of June 30, 2025. The projected capital payback period for both stages is 4.8 years.
Energy Fuels acquired control of the project in October 2024 following its purchase of Base Resources. The Government of Madagascar lifted a suspension on the project in November 2024, and the company has since resumed development activities, including negotiations on an investment agreement and steps to secure land access.
The information in this article is based on a press release statement and a recent SEC filing.
In other recent news, Energy Fuels Inc. announced that it had exceeded its 2025 uranium production and sales guidance, producing over 1 million pounds of finished uranium. This development has led to increased expectations for both near-term and long-term sales. Additionally, the company released an updated feasibility study for its Vara Mada project in Madagascar, highlighting exceptional economics with a $1.8 billion post-tax net present value. The project, containing reserves of titanium, zircon, and rare earth minerals, is expected to generate up to $500 million in annual EBITDA at full capacity.
In terms of analyst ratings, Texas Capital Securities initiated coverage on Energy Fuels with a Buy rating, citing the potential of its uranium operations, including the White Mesa Mill in Utah. Conversely, Roth/MKM downgraded Energy Fuels from Neutral to Sell, even as they raised the price target to $11.50, noting that recent share price surges were driven more by market excitement than fundamental changes. Despite these mixed analyst perspectives, the company’s recent advancements in uranium production and the promising outlook for the Vara Mada project remain significant. Meanwhile, broader industry challenges persist, as China continues to restrict rare earth elements, impacting U.S. domestic production capabilities.